Effect of ERV on AC Run Time

Updated: Aug 20, 2023


Screenshot of Adicot's Psychrometric Chart 2-Condition Calculator

My colleague and I had a recent discussion about his ongoing project. We focused on figuring out how adding an Energy Recovery Ventilator (ERV) to treat ventilation air impacts the run time of air conditioning equipment. To answer this, we used adicot.com's Psychrometric Chart 2-Condition Calclator and the methodology shown below to compare equipment run times with untreated ventilation air versus ventilation air treated by an ERV. The results showed an impressive 27% reduction in equipment run time due to the ERV implementation. You'll find the details of our approach in the following section.


To solve this problem, we assumed the following will be given:


Given:

  • Equipment Cooling Capacity [BTU/h] provided by the manufacturer

  • ASHRAE Outside air design temperatures (Dry bulb and wet bulb) [oF]

  • Coil Leaving Air Temperatures (Dry bulb and wet bulb) [oF] provided by the manufacturer

  • Ventilation air volume [cfm] per ASHRAE 62.# or Building Code


Procedure:

  1. Calculate the Ventilation Air Total Cooling Load [BTU/h] (Psychrometric Chart 2-Condition Calculator)

  2. Run time = Ventilation load/Equipment Capacity x 60 min [min]

Example:

  • Equipment Cooling Capacity: 2.50 tons or 30,000 BTU/h

  • Outside air temperatures in Boston, MA: 88oF / 72oF

  • Coil Leaving Air Temperatures: 55oF / 54.9oF

  • Ventilation air volume: 100 CFM


  1. Calculate the total load of ventilation air using Psychrometric Chart 2-Condition Calculator where:

    • Entering Conditions are outside air design temperatures

    • Exiting Conditions are coil-leaving air temperatures Ventilation Air Total Cooling Load = 5,483 BTU/h

  2. Run time =5,483 BTU/h / 30,000 BTU/h x 60 min/hr = 11 minutes/hour to condition the ventilation air


Adding an ERV: Replace outside air temperature with the ERV leaving air temperature (100 CFM @ 78 Dry bulb, 68 Wet bulb):

  1. Total Load: 4,023 BTU/h

  2. Run time: 8 minutes/hour to condition ventilation air

The results show the effect of ERV or AC Equipment Run time is significant and that adding an ERV reduces the equipment run time caused by ventilation air by 27%.


Let us know how you use our Adicot Calculators

Comments


 

©2014-2025 by Adicot, Inc.

Report a Problem with our HVAC Calculators

Adicot, Inc.'s calculators are intended for professionals. Adicot, Inc. makes no warranty of any kind, expressed or implied, concerning the information contained on this website. The information presented on this website shall be used by professionals who understand the implications of the results. If professional services are required, please consult a licensed professional engineer in your location, as building codes differ based on differing jurisdictions. The author and publisher shall not be liable in the event of damages of any kind in connection with, or arising from, the use of the information contained within this website.  Any use of this website, including the calculators, is at the user’s sole risk. Use of the website, including the calculators, in any way shall constitute an acknowledgment and acceptance of the foregoing.

​The calculators' accuracy is dependent on user-supplier data. It is the user's responsibility to understand how the data entered affects calculator output. The calculation results are meant to aid the designer and are not a substitute for professional design service, judgment, or experience. The user accepts all responsibility for any claims, actions, or damages from using the calculators.