Form C402 is the Florida Building Code, Energy Conservation's form for alterations, renovations and building systems in commercial buildings: a new rooftop unit, a reroof, replacement windows, a new water heater. For each component the project changes, it lists the requirement and the installed value. What a permit needs is up to the building department.

This page helps you fill the form in. Pick the county and the occupancy, check the components in this project, and enter what is installed; each value shows whether it meets the code's minimum as you type, with the value it needs under any that do not. Print the form prints Form C402 following the layout in the code's Appendix CA.

How to use it

  1. Choose the code edition and the county. The edition in force on the date of the permit application governs: the 8th Edition (2023) until December 30, 2026, and the 9th Edition (2026) from December 31, 2026. A new project starts on the edition in force today. Zone 1 is Broward, Collier, Hendry, Lee, Miami-Dade, Monroe and Palm Beach counties; every other county is zone 2.
  2. Choose the occupancy: Group R uses the "Group R" column of the envelope tables, everything else the "All other" column.
  3. Under Components in this project, check only the components being installed or changed; components not checked print as "N/A" (not applicable).
  4. Enter each component's installed values. For the roof, walls and floor, choose whether the assembly is shown by its U-factor or by its insulation R-values.
  5. Enter the preparer's and owner's names, and print. The signature and date lines print blank.

Your entries stay in this browser and come back when you return. Save project file writes them to a file on your own computer, and Open project file brings a saved project back. Nothing is sent to us.

What the form checks

Envelope. Each opaque assembly is checked either by its assembly U-factor (C- or F-factor for below-grade walls and slabs) against Table C402.1.4, or by its insulation against Table C402.1.3, where cavity and continuous insulation are entered separately and any one of the table's combinations complies. Low-slope roofs in zone 1 need a three-year aged solar reflectance of 0.63 and thermal emittance of 0.75, or an aged SRI of 75; in zone 2, 0.55 and 0.75, or SRI 64 (Table C402.3). Under the 2026 edition, swinging opaque doors need U-0.37 (U-0.61 in 2023).

Windows and skylights. Table C402.4 sets the U-factor by window type (fixed, operable, entrance door) and the SHGC by orientation and projection factor. In the 2023 edition fixed windows need U-0.50 in both zones; in 2026, U-0.50 in zone 1 and U-0.45 in zone 2. Greenhouses use Table C402.1.1.1 instead.

Equipment. Air conditioners, heat pumps, PTACs and PTHPs, SPVACs and SPVHPs, and VRF systems are checked against Tables C403.2.3(1), (2), (3), (11) and (12): SEER2 under 65,000 Btu/h, IEER (and EER where the table lists it) above. A heat pump's heating ratings come from the same tables. Furnaces, boilers and other heating equipment are entered with the minimum from their table.

Ducts and piping. Duct insulation follows Table C403.2.9.1 by location (R-6 supply and R-4.2 return outside the building or in a ventilated attic, for instance), and pipe insulation Table C403.2.10 by fluid temperature and pipe size.

Water heating. Table C404.2: the uniform energy factor worked out from the rated volume and draw pattern for residential-size water heaters, thermal efficiency for commercial ones, 82 % for gas pool heaters and COP 4.0 for heat pump pool heaters.

Entered as given. Dehumidifiers, lighting power and fan power need the requirement from their own tables, which depend on the space or system; enter it with the installed value. Dehumidifiers and lighting are compared; fan power and Other print as entered.

Example: a rooftop unit replacement

Show an example fills in a made-up changeout in Orange County (climate zone 2), with placeholders for the names and address: a 120,000 Btu/h air-cooled rooftop air conditioner with electric heat, rated 15.2 IEER, and new supply and return ductwork outside the building, insulated to R-8 and R-6.

  • Air conditioner: 65,000 to 135,000 Btu/h with electric resistance heat needs 14.8 IEER; 15.2 meets it.
  • Ducts outside the building need R-6 supply and R-4.2 return; R-8 and R-6 meet them.

Limits

The form covers alterations, renovations and building systems. Whole-building compliance, or a project that does not meet these minimums, is shown by ASHRAE 90.1 or the performance method of Section C407 with approved software. The printed form is the preparer's: the person who signs it is responsible for the entries, and the building department reviews it.